
BAO KIEN STONE QUALITY CONTROL
Quality, Controlled at Every Stage.
From incoming materials to final shipment, every Bao Kien Stone product moves through a documented quality control process built around measurable standards, traceable records and timely corrective action.
AQL
2.5
Default sampling standard
Every
1–2 Hours
In-process patrol inspection
First Article Approval
Before mass production
One Process.
Multiple Control Points.
Quality is not a single inspection at the end of production. It is a continuous control system covering materials, manufacturing, finished products, shipment and corrective action.
01
Incoming Quality Control
Materials are verified against purchase and delivery information before entering production. Model, batch, quantity, documentation, dimensions, appearance and material condition are checked through sampling inspection.
02
First Article Approval
New batches, material changes, mould changes and process adjustments require first article inspection. Mass production begins only after the first piece has been approved.
03
In-Process Quality Control
QC patrol inspections are conducted every one to two hours during mass production, with particular attention to cutting, polishing, forming and bonding processes.
04
Final & Pre-Shipment Inspection
Finished products are checked against order requirements, customer standards, packaging specifications and shipping information before release.
05
Corrective Action
Non-conforming products are identified, isolated and processed through rework, repair, controlled acceptance or disposal. Repeated defects trigger an 8D corrective-action process.
What We Inspect
Every inspection is conducted against applicable drawings, approved samples, order specifications and customer-defined requirements.
Dimensions

Overall dimensions, profiles, curves
and specified tolerances.
Flatness

Surface flatness and dimensional consistency
across the finished product.
Surface Appearance

Scratches, chips, visible damage
and other surface imperfections.
Color Consistency

Color and visual consistency are reviewed
against approved reference samples.
Packaging Protection

Packaging condition, protective materials,
labels and carton marks.
Shipment Quantity

Product quantity and shipping information
are verified before release.
Clear Status. Controlled Decisions.
Non-conforming materials and products are separated by stage and disposition.
Depending on the result of the assessment, they may be reworked, repaired, scrapped or submitted for controlled acceptance.

Measured. Recorded. Traceable.
Inspection results are documented throughout the quality process. Controlled records help our team track material batches, production findings, corrective actions and final shipment status.
1
Incoming Inspection Report
2
IPQC Patrol Inspection Form
3
Pre-Shipment Inspection Report
4
Non-Conforming Product Form
5
8D Improvement Report
6
Calibration Records
7
Approved Samples and Inspection Standards
From Containment to Prevention.
Reported issues and repeated defects are addressed through a structured 8D process. Initial containment is implemented within 24 hours, followed by root-cause analysis, corrective action, verification and preventive standardization.
D1
Build the team
D2
Define the problem
D3
Contain the risk
D4
Identify the root cause
D5
Define permanent action
D6
Implement and verify
D7
Prevent recurrence
D8
Close and document

Dedicated Quality Responsibilities.
Quality control responsibilities are assigned across incoming inspection, in-process control, pre-shipment inspection, documentation and corrective-action management.
Our quality documentation, inspection tools, approved samples and calibration records are managed through controlled numbering and filing procedures. Internal audits, employee training and regular quality reviews support consistent implementation across the factory.
















